Project 22FN0030
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-22FN0030",
"title": "SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF PANOYPOYAN BRIDGE, BULA, CAMARINES SUR",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Camarines Sur 5th DEO"
},
"period": {
"startDate": "2022-02-22",
"endDate": "2022-07-28"
},
"budget": {
"amount": {
"amount": 47285313.97,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
123.26438,
13.45862
]
}
}
],
"parties": [
{
"name": "RICHMAR CONSTRUCTION",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "22FN0030",
"summary": {
"title": "SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF PANOYPOYAN BRIDGE, BULA, CAMARINES SUR",
"status": "closed",
"contractValue": {
"amount": 47285313.97,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2022 CSSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "2a49f31cded4b4340d5205166b2459b2223cb4434ecd4053519b9b9e50cce41a"
}
}