Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22FO0056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FO0056","CLUSTER III-2022: 1.) CONSTRUCTION OF PINANGANURAN RIVER CONTROL STRUCTURE, BARANGAY VILLA PETRONA, LIBON, ALBAY; AND 2.) CONSTRUCTION OF PINANGANURAN RIVER CONTROL STRUCTURE, BARANGAY SAN JOSE, LIBON, ALBAY","Flood Control and Drainage","Completed",98000000,0,100,"Albay 3rd DEO","Region V","RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES (8092)","2022-03-22","2022-12-15",2022,"Regular Infra - GAA 2022 CSSP",13.25417,123.37833,"500507000","500500000"]
SHA-256
9188604810b6839a7cd59bc22ee4e2d33916b37766f68d1fe8f52d7c3adfe79a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.