Project 22FO0092
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FO0092","CLUSTER VIII-FY 2022: (1)REHABILITATION OF SAN RAFAEL FLOOD CONTROL STRUCTURE (IRAYA SECTION), GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MANINILA RIVER (BRGY. MANINILA-BRGY.MASARAWAG) FLOOD MITIGATION SYSTEM, GUINOBATAN, ALBAY","Flood Control and Drainage","On-Going",85377470.3,0,68.84,"Albay 3rd DEO","Region V","RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST. (32331)","2022-07-11",null,2022,"Regular Infra - GAA 2022 CSSP",13.19355,123.60037,"500504000","500500000"]
SHA-256
e9ced0c912ec4b4a76eb9198eb7e35e302082ccbdda5b3fe0b3d3f9fe3d8ca9bHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.