Project 22FO0094
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22FO0094","CLUSTER IX-2022: (1) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURE, BRGY. MORERA AND BRGY. SAN RAFAEL, GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MULADBUCAD FLOOD CONTROL DIKE IN MULADBUCAD, GUINOBATAN, ALBAY","GAA 2022 CSSP","Completed",97979504.35,0,100,"Albay 3rd DEO","Region V","RCDS CONSTRUCTION & SUPPLY, INC.(FOR RCDS CONST. (32331)","2022-04-07","2023-08-31",2022,"Regular Infra - GAA 2022 CSSP",13.24988,123.61431,"500504000","500500000"]