Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22GP0070

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22GP0070","CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, SITIO ILAYA PROPER, BRGY. ATIPLO, MAMBUSAO, CAPIZ","Flood Control and Drainage","Completed",55969403.95,0,100,"Capiz 2nd DEO","Region VI","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2022-03-06","2024-02-02",2022,"Regular Infra - GAA 2022 OO-2",11.43318,122.61026,"601908000","601900000"]
SHA-256
f975018e63a33798d3d5129e85ae5b079d74502a387ac9a0132106a8415988f0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.