Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HA0087

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HA0087","CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - CONSTRUCTION OF BALILIHAN WATERWORKS PROJECT (PHASE II), BALILIHAN, BOHOL","Water Provision and Storage","On-Going",67450000,0,57.24,"Bohol 1st DEO","Region VII","JA ACHACOSO ENTERPRISES & GENERAL SERVICES (33229)","2022-09-13",null,2022,"Regular Infra - GAA 2022 CSSP",9.75383,123.94993,"701206000","701200000"]
SHA-256
5959b1625b9a42677a9dff14efc956bc685121d377efeca518afdf753b59e5ff

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.