Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HB0146

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-22HB0146",
  "title": "REPAIR/REHABILITATION OF SAN ANTONIO RIVER CONTROL, DUERO, BOHOL STA. 0+000-STA. 0+099.43, BOTH SIDE, STA. 0+800.00-STA. 0+867.50 RIGHT SIDE, STA. 0+910.00-STA. 0+925.83 LEFT SIDE",
  "sector": [
    "Flood Control and Drainage"
  ],
  "status": "completed",
  "publicAuthority": {
    "name": "DPWH Bohol 3rd DEO"
  },
  "period": {
    "startDate": "2022-04-06",
    "endDate": "2022-11-02"
  },
  "budget": {
    "amount": {
      "amount": 28948912.26,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          124.40706,
          9.70895
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "22HB0146",
      "summary": {
        "title": "REPAIR/REHABILITATION OF SAN ANTONIO RIVER CONTROL, DUERO, BOHOL STA. 0+000-STA. 0+099.43, BOTH SIDE, STA. 0+800.00-STA. 0+867.50 RIGHT SIDE, STA. 0+910.00-STA. 0+925.83 LEFT SIDE",
        "status": "closed",
        "contractValue": {
          "amount": 28948912.26,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "Completed",
    "physicalProgressPercent": 100,
    "fundingSource": "Regular Infra - GAA 2022 CSSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "b8a3d401ed85a40dd5af52e2fee8aa90077f2a91233792d4d25488538d13635e"
  }
}