Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22HD0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HD0015","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY CADUAWAN, STA. 0+000 - STA. 1+163, TABOGON, CEBU","Flood Control and Drainage","Completed",72375000,0,100,"Cebu 4th DEO","Region VII","PRIME GIGABUILD CONSTRUCTION CORP. (FORMERLY: RON DANIELL CONSTRUCTION CORPORATION) (31251)","2022-02-21","2022-11-21",2022,"Regular Infra - GAA 2022 OO-2",10.92867,123.9723,"702248000","702200000"]
SHA-256
4f97e06415c058003fdf18c0a8c7b1b8df99ae3be855d856cf8b8acc9c31e424

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.