Project 22HF0077
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HF0077","CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG BARILI-ALOGUINSAN BYPASS RD., BRGY. HILAGASAN, BARILI, CEBU, STA. 0+000.00 - STA. 0+219.00","GAA 2022 CSSP","Completed",96497907.4,0,100,"Cebu 3rd DEO","Region VII","JJ&J CONSTRUCTION AND GENERAL SUPPLY CORPORATION (FORMERLY: JJ &J CONSTRUCTION & GENERAL SUPPLY) (30231) / REBTRADE INTERNATIONAL CORPORATION (36213)","2022-06-30","2023-02-17",2022,"Regular Infra - GAA 2022 CSSP",10.16269,123.51993,"702210000","702200000"]
SHA-256
ded0a2d579fe4e9baa3d756d556e2b72c49bd5fa5fcd2ca2253c68a8f04b08b3Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.