Project 22HL0089
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22HL0089","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF MALADPAD RIVER CONTROL (DOWNSTREAM), SIATON, NEGROS ORIENTAL","Flood Control and Drainage","Completed",49000000,0,100,"Negros Oriental 3rd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. (43834)","2022-04-18","2022-11-06",2022,"Regular Infra - GAA 2022 CSSP",9.12118,122.92206,"1804619000","1804600000"]
SHA-256
7d807f88d78569cff66b2b5cb25d9d4437bd8a63f388a99a63cde5374f9d0636Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.