Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22IB0067

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22IB0067","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL ALONG SURIBAO RIVER, BRGY. CAMADA, BORONGAN CITY, EASTERN SAMAR","Flood Control and Drainage","Completed",19599983.4,0,100,"Eastern Samar DEO","Region VIII","J.A. DEVELOPERS AND ENGINEERS (43714)","2022-03-31","2022-08-04",2022,"Regular Infra - GAA 2022 OO-2",11.53996,125.45922,"802604000","802600000"]
SHA-256
433ef8a3f121736a705445463b55ae0e1f4a9589bef4c475cfd3241ce4133505

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.