Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22ID0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22ID0040","RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - CALBASAG BRIDGE (B00065LT) ALONG DAANG MAHARLIKA (LT), DULAG, LEYTE","Bridges","Completed",2866429.7,0,100,"Leyte 2nd DEO","Region VIII","BUILDTRON CONSTRUCTION CORPORATION (48375)","2022-03-23","2022-05-06",2022,"Regular Infra - GAA 2022 OO-1",10.96412,125.03273,"803718000","803700000"]
SHA-256
e8cf7a3a7923ce1839d2169666047a5d2bdf96afaa67ff55389fe0f841dafe1e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.