Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22KB0072

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22KB0072","CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, RAWARI BRIDGE, SITIO RAWARI, KITAOTAO, BUKIDNON","Flood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",67550000,0,100,"Bukidnon 2nd DEO","Region X","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2022-02-24","2023-06-07",2022,"Regular Infra - Flood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",7.59043,125.19742,"1001309000","1001300000"]
SHA-256
34e0b693a985d4992e746e9104f0d2674d860041a24a45f003f3c6f1a0924e49

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.