Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22KD0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22KD0021","CONST OF SLOPE PROTECTION BRGY BUGO, CAGAYAN DE ORO","Flood Control and Drainage","Completed",4691762.96,0,100,"Cagayan de Oro City 2nd DEO","Region X","BLACK ROAD CONSTRUCTION (49285)","2022-03-16","2022-10-04",2022,"Regular Infra - GAA 2022 CSSP",8.50903,124.75903,"1030500000","1004300000"]
SHA-256
5df7565cd4e2d3f331ccfd5e2d6b0ad8e745769a0f6288117a3f0fbf2171f849

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.