Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22M00052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22M00052","CONSTRUCTION OF RIVER BANK PROTECTION (RIPRAP) AT BARANGAY MASLABENG, STA 0+531-STA 0+844, BULUAN, MAGUINDANAO","Flood Control and Drainage","Completed",49399692.3,0,100,"Region XII","Region XII","FFJJ CONSTRUCTION (16712)","2022-04-13","2022-12-18",2022,"Regular Infra - GAA 2022 CSSP",6.667,124.80973,"1908814000","1908800000"]
SHA-256
90f5986670c3d30bc7256b20ce0e82e9807930d1a82eedbc98e2fde043e675ea

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.