Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22NF0081

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22NF0081","CONSTRUCTION OF EMBANKMENT, BARANGAY 2 AND 6 (PHASE 2), DAPA, SURIGAO DEL NORTE","Flood Control and Drainage","Completed",14767348.1,0,100,"Surigao del Norte 1st DEO","Region XIII","MEGA MYKON BUILDERS (40106)","2022-05-27","2022-07-20",2022,"Regular Infra - GAA 2022 CSSP",9.75466,126.05347,"1606707000","1606700000"]
SHA-256
9120a3ed40469c6a598c5d4a170c9bdcc73601612ca645f6b96c80a660dbfe8e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.