Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22NI0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22NI0045","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION ALONG POBLACION BISLIG RIVER, STA. 0+000.00 - STA. 0+127.00, BISLIG CITY, SURIGAO DEL SUR","Flood Control and Drainage","Completed",62723880.33,0,100,"Surigao del Sur 2nd DEO","Region XIII","CONCEPCION BASIC BUILDERS INC. (5255)","2022-03-14","2023-03-17",2022,"Regular Infra - GAA 2022 OO-2",8.21875,126.31327,"1606803000","1606800000"]
SHA-256
cdd900346ada7f463fff8ca27a1f092dc1b3dec854fdd4eb8cbada40a172b034

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.