Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22PA0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22PA0040","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, STA.25+800-STA.26+300, CABARUYAN,","Flood Control and Drainage","Completed",48997987.95,0,100,"Abra DEO","Cordillera Administrative Region","A.D. MARRERO GENERAL CONSTRUCTION (32448)","2022-02-17","2022-07-22",2022,"Regular Infra - GAA 2022 OO-2",17.44954,120.905,"1400105000","1400100000"]
SHA-256
aee23752ea06ab718362949a64f67d59a67c3cd8c954aea9c434478cca9bc32c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.