Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23A00255

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23A00255","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER (PACKAGE 2), STA. MARIA, ILOCOS SUR","Flood Control and Drainage","Completed",46807469.14,0,100,"Ilocos Sur 2nd DEO","Region I","MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) (11363)","2023-04-05","2024-12-02",2023,"Regular Infra - GAA 2023 OO-2",17.38577,120.47349,"102926000","102900000"]
SHA-256
840553b58cade04e810aab929e9594e4a50f8ed220bc1f505600b1eb2c30a1ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.