Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CB0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CB0020","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABO-ABO RIVER (UPSTREAM) CITY OF BALANGA, BATAAN","Flood Control and Drainage","Completed",53075000,0,100,"Bataan 2nd DEO","Region III","BPQ CONSTRUCTION AND TRADING (40632) / POLYMER-VIC CONSTRUCTION (6157)","2023-02-20","2023-06-26",2023,"Regular Infra - GAA 2023 OO-2",14.65178,120.49663,"300803000","300800000"]
SHA-256
ca4f7ecaca9860ce17c4a35c87b3a845faaa81f9095b9a435b550017ba9b82f3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.