Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0092","CONSTRUCTION OF RIVER CONTROL PROJECT ALONG BALAGTAS RIVER, PANGINAY (LS), STA. 13+090 - STA. 13+295, BALAGTAS, BUALCAN","Flood Control and Drainage","Completed",96499913.18,0,100,"Bulacan 1st DEO","Region III","AZUL BUILDERS (21870) / JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2023-02-13","2023-08-22",2023,"Regular Infra - GAA 2023 OO-2",14.8056,120.89987,"301402000","301400000"]
SHA-256
e8d08706150e5547a5bed1ca020ca3626cd3d471169ea58b58d54a2c98a0a592

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.