Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CC0542

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CC0542","CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BOCAUE RIVER BRGY,TAAL BOCAUE, BULACAN STA. 002+152 TO STA. 002+302","Flood Control and Drainage","Completed",72374166.79,0,100,"Bulacan 1st DEO","Region III","M.G. FRANCISCO CONSTRUCTION (29831)","2023-12-21","2024-04-18",2023,"Outside Infra - Unprogrammed Appropriations 2023",14.80599,120.92811,"301404000","301400000"]
SHA-256
3e842acc1ec6e883af1c0f7eaa0f9e6c49cd7ae721c12140e08df225e3a5bef4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.