Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CE0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CE0006","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER, BARANGAY PARTIDA I, GUIMBA, NUEVA ECIJA","GAA 2023 OO-2","Completed",48994000,0,100,"Nueva Ecija 1st DEO","Region III","MIVICO 323 CONSTRUCTION CORP. (FORMERLY: MIVICO BUILDERS AND DEVELOPERS) (20551)","2023-02-13","2023-10-10",2023,"Regular Infra - GAA 2023 OO-2",15.6414,120.71448,"304911000","304900000"]
SHA-256
2b5c0d1b5a97d435ca2e0e3c933471bce065c045c19a6e42921b46ce76a25188

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.