Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CE0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CE0121","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. PARTIDA II, GUIMBA, NUEVA ECIJA","Flood Control and Drainage","Completed",14845001.02,0,100,"Nueva Ecija 1st DEO","Region III","MJ O. BETIS BUILDERS (48706)","2023-06-06","2023-12-02",2023,"Regular Infra - GAA 2023 CSSP",15.64959,120.73437,"304911000","304900000"]
SHA-256
3be0f83b4746ba797f5522df9b0d68063bde78d4c2611aab4a2c0bf152514c60

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.