Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23CF0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23CF0020","CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG PAMPANGA RIVER, STA. 26+360.00-STA. 26+697.60, BARANGAY ALUA, SAN ISIDRO, NUEVA ECIJA","Flood Control and Drainage","Completed",72374903.94,0,100,"Nueva Ecija 2nd DEO","Region III","F-DEY CONSTRUCTION AND TRADING (38824) / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION) (18453)","2023-03-24","2023-10-10",2023,"Regular Infra - GAA 2023 OO-2",15.30775,120.89947,"304925000","304900000"]
SHA-256
3a800cd0e382ac6bd65ce23b2413ead4432d0ea2065b862dc1f16cd258845491

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.