Hashed input (canonical JSON of the source row)
["dpwh","23CN0204","CONSTRUCTION OF 3 STY 9 CL SCHOOL BUILDING, MAYOR CESARIO A. PIMENTEL NHS, SAN LUIS, AURORA","Buildings and Facilities","Completed",29466330.56,0,100,"Aurora DEO","Region III","BRENCON DEVELOPERS PHILS. INC. (36731)","2023-09-05","2024-11-06",2023,"Outside Infra - GAA 2023 DepEd BEFF",15.72216,121.52157,"307708000","307700000"]
SHA-256
87743a8ae0238fa3c9619403e9ccd7573070af30fd1b2517b331f464f762fed5