Project 23DH0100
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-23DH0100",
"title": "REPAIR/REHABILITATION OF RIVER CONTROL ALONG STA. CRUZ RIVER, STA. CRUZ SECTION, BRGY. PATIMBAO (STA. 000+100-STA. 000+139) (RS), AND BRGY. PAGSAWITAN ( STA. 000+548-STA. 000+596) (LS) UPSTREAM, STA. CRUZ, LAGUNA",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Laguna 1st DEO"
},
"period": {
"startDate": "2023-11-23",
"endDate": "2024-06-19"
},
"budget": {
"amount": {
"amount": 18607381.02,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
121.42364,
14.26307
]
}
}
],
"parties": [
{
"name": "TRIPLE EAGLE CONSTRUCTION AND TRADING",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "23DH0100",
"summary": {
"title": "REPAIR/REHABILITATION OF RIVER CONTROL ALONG STA. CRUZ RIVER, STA. CRUZ SECTION, BRGY. PATIMBAO (STA. 000+100-STA. 000+139) (RS), AND BRGY. PAGSAWITAN ( STA. 000+548-STA. 000+596) (LS) UPSTREAM, STA. CRUZ, LAGUNA",
"status": "closed",
"contractValue": {
"amount": 18607381.02,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2023 CSSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "70429e00a726ae5d0af262586be181ccd043c974ec51bffc84ade52f573c899c"
}
}