Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DO0072

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DO0072","CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY MALY, SAN MATEO, RIZAL","Flood Control and Drainage","Completed",4950000,0,100,"Rizal 2nd DEO","Region IV-A","22 PRIME CONSTRUCTION AND REALTY DEVELOPMENT INC. (45578)","2023-05-10","2023-10-01",2023,"Regular Infra - GAA 2023 CSSP",14.70978,121.14039,"405811000","405800000"]
SHA-256
2e620a1a20cd8049cc37e41babb0b60f3b6b5d6ce6839fd780be9fa0a570c93c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.