Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FH0105

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FH0105","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -  CONSTRUCTION OF RIVER CONTROL AT BARANGAY DUGUI WALA, VIRAC, CATANDUANES","Unprogrammed Appropriations 2023","On-Going",4824998.3,0,0,"Catanduanes DEO","Region V","WILLTORR CONSTRUCTION (15418)","2024-02-16",null,2023,"Outside Infra - Unprogrammed Appropriations 2023",null,null,null,"502000000"]
SHA-256
ef7b69486a14d60ec8e1f3d6c91a4a54a90f79facda433a9c1f4525460c83b35

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.