Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FK0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FK0004","CLUSTER III-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUIDLINGS/FACILITIES TO SUPPORT SOCIAL SERVICES 1.) CONST. OF MULTI-PURPOSE BLDG., BRGY. BURABOD, CASTILLA, 2.) CONST. OF MULTI-PURPOSE BLDG., BRGY","GAA 2023 CSSP","Completed",39249024.41,0,100,"Sorsogon DEO","Region V","KM88 CONSTRUCTION INC (FORMERLY: KM14 CONSTRUCTION INC) (41871) / TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION) (11697)","2023-02-15","2023-08-11",2023,"Regular Infra - GAA 2023 CSSP",12.93514,123.78075,"506206000","506200000"]
SHA-256
9be6a33f3f65ddac9db83e5035c2e9f00e40ca0950ab7eb65719cb831cfdde4b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.