Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FM0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FM0003","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT SIARGAO RIVER (UPSTREAM), POBLACION DISTRICT 2, CLAVERIA, MASBATE.","Flood Control and Drainage","Completed",23516730.44,0,100,"Masbate 1st DEO","Region V","SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY) (42402)","2023-04-09","2023-07-15",2023,"Regular Infra - GAA 2023 OO-2",12.89966,123.23797,"504107000","504100000"]
SHA-256
e8583a00fb8a321298c0d8571ce6d0d2a3e6d7549199c53632dea584db06ec1e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.