Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FO0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FO0005","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG NASISI RIVER (DOWNSTREAM OF TOBGON BRIDGE) PHASE II, BARANGAY NASISI AND BARANGAY BATANG, LIGAO CITY, ALBAY","Flood Control and Drainage","On-Going",69839746.24,0,100,"Albay 3rd DEO","Region V","3DIAMONDS CONSTRUCTION CORPORATION (35457)","2023-03-21",null,2023,"Regular Infra - GAA 2023 CSSP",13.25941,123.5748,"500508000","500500000"]
SHA-256
0b6d692450303e46925f71dbaef615af67c1343d1288800a435641363946a5f3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.