Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23GM0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GM0043","CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY INAPOY, KABANKALAN, NEGROS OCCIDENTAL","Water Provision and Storage","Completed",9800000,0,100,"Negros Occidental 3rd DEO","Negros Island Region","NOVANNE VENTURES CONSTRUCTION CORPORATION (NOVANNE (22107)","2023-03-27","2024-11-12",2023,"Regular Infra - GAA 2023 CSSP",9.80972,122.86666,"1804515000","1804500000"]
SHA-256
f30fc8efdabfbbc29e33f41a3f3f3e38cee09a8669bdb29b3257cb39f12182fa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.