Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23GO0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GO0033","CONSTRUCTION OF DRAINAGE SYSTEM, HILADO ST., BACOLOD CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",19600000,0,100,"Bacolod City DEO","Negros Island Region","BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)","2023-03-15","2023-06-22",2023,"Regular Infra - GAA 2023 OO-2",10.67417,122.95891,"1830200000","1804500000"]
SHA-256
899eb2a0d16f969d5bce255a8dfb11c45fb93b1915a07b19847d68a7ccdf7e47

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.