Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23GP0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GP0083","CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. STA. MONICA, DUMALAG, CAPIZ","Water Provision and Storage","Completed",9749984.72,0,100,"Capiz 2nd DEO","Region VI","KERGEL BUILDERS (44923)","2023-07-31","2024-03-04",2023,"Regular Infra - GAA 2023 CSSP",11.35148,122.64535,"601903000","601900000"]
SHA-256
c0a67125f6eaee5fc7656a5714e8753d3e49f4496d35b482c5f6b425e372b3e3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.