Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HB0115

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HB0115","CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE  AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM,  MUNICIPALITY OF GARCIA HERNANDEZ, BOHOL","Water Supply (Level 1): Construction (Shallow Wells/Rainwater Collectors), Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)","Completed",9800000,0,100,"Bohol 3rd DEO","Region VII","AL CHRIS CONSTRUCTION (12406)","2023-07-13","2024-02-29",2023,"Regular Infra - Water Supply (Level 1): Construction (Shallow Wells/Rainwater Collectors), Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)",9.62159,124.28456,"701222000","701200000"]
SHA-256
85b0bded936a069321dd78f2c97d339cc5034e03169b15ecc63abeda449b7bcf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.