Project 23HN0051
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HN0051","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL/DRAINAGE IN BARANGAYS BASAK AND BABAG (PHASE 3), LAPU-LAPU CITY, CEBU","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP","Completed",29400000,0,100,"Cebu 6th DEO","Region VII","FLORIANE CONSTRUCTION CORPORATION (FORMERLY: FLORIANE CONSTRUCTION & SUPPLY) (12261)","2023-02-14","2023-09-07",2023,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP",10.28898,123.95468,"731100000","702200000"]
SHA-256
bbd95e498f19cd2333022a82ef991f450a7daacf04a4627103221e106743016bHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.