Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23IA0068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23IA0068","CONSTRUCTION OF BAGONGBONG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE V, ALMERIA, BILIRAN","Flood Control and Drainage","Completed",14694663.36,0,100,"Biliran DEO","Region VIII","SUNRISE BUILDERS (39757)","2023-03-09","2023-10-16",2023,"Regular Infra - GAA 2023 OO-2",11.61822,124.39357,"807801000","807800000"]
SHA-256
16293c3805a243d1430e015ef8f322f57cfaa5abbf1fb65c67d70a6fae94ec33

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.