Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00138

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00138","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY","Flood Control and Drainage","On-Going",143301641.39,0,60.99,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2023-08-31",null,2023,"Regular Infra - GAA 2023 OO-2",6.91979,122.1019,"931700000","907300000"]
SHA-256
c1336af6856feaae4a5e2dc7faad3049330fd0c2ee563d0bc7cb8f25fd742b42

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.