Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00139

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00139","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY","Flood Control Structures, Roads","On-Going",143230123.46,0,62.06,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2023-08-31",null,2023,"Regular Infra - GAA 2023 OO-2",6.92548,122.11302,"931700000","907300000"]
SHA-256
b6e91d6173df552bd33da2c8ba17cf6b60a18fd842c2cf11f908abd788df2016

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.