Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00140

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00140","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY","GAA 2023 OO-2","On-Going",143231584.11,0,87.65,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2023-08-31",null,2023,"Regular Infra - GAA 2023 OO-2",6.9251,122.11345,"931700000","907300000"]
SHA-256
18f559306ce179bb033d92ceedc0e9953d024161cc3d5434aed53346825a48cf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.