Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00205

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00205","CONSTRUCTION OF MULTI-PURPOSE BUILDING, AREA COORDINATING CENTER FOR MUNICIPALITY, BONGAO, TAWI-TAWI","GAA 2023 CSSP","On-Going",48103596.3,0,95.7,"Region IX","Region IX","AL-HUSAYN CONSTRUCTION (17295)","2023-06-16",null,2023,"Regular Infra - GAA 2023 CSSP",5.0236,119.75712,"1907002000","1907000000"]
SHA-256
fdec6a98a35f7e7b7da6770dca540e486174360291197c45c4606fb7bd593afc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.