Project 23J00217
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00217","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVERS BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT/BANK PROTECTION) ALONG DIPOLOG RIVER (SIANIB SECTION), POLANCO, ZAMBOANGA DEL NORTE","Flood Control and Drainage","On-Going",96311686.21,0,90.75,"Region IX","Region IX","FIAT CONSTRUCTION SERVICES (05463) / ZAMBO J.A. BUILDERS (40678)","2023-07-13",null,2023,"Regular Infra - GAA 2023 OO-2",8.46697,123.38773,"907210000","907200000"]
SHA-256
75a72b4de0c93c2626e9263e4f5d2f27abe8a73ed4546b830e2d4de50a0a447aHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.