Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23KB0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23KB0055","CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON PACKAGE 2, DOLOGON, MARAMAG, BUKIDNON","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",52518810.52,0,100,"Bukidnon 2nd DEO","Region X","JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION) (15759)","2023-02-28","2023-11-24",2023,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",7.85339,125.04909,"1001315000","1001300000"]
SHA-256
0a9d822f75acf524288ad7efd518603f95ab9846294a7dc898d31d02f587dc7a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.