Project 23LB0157
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LB0157","CONSTRUCTION/REHABILITATION OF DRAINAGE STRUCTURE ALONG JUNCTION E. QUIRINO AVENUE - PELAYO STREET - A. BONIFACIO STREET GOING TO ANDA MAINDRAIN, BRGY. 2-A TO BRGY. 3-A, DAVAO CITY","Roads","Completed",48250000,0,100,"Davao City DEO","Region XI","A.Y.U. ENGINEERING & CONSTRUCTION (25632)","2024-01-09","2025-02-11",2023,"Outside Infra - Unprogrammed Appropriations 2023",7.0687,125.60695,"1130700000","1102400000"]
SHA-256
e4e0ad0a6a44f3a0fadb603567814b4c8153bb1d939084bcf20c2e9630c24d6dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.