Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23OC0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23OC0063","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (INSTALLATION OF BOOSTER PUMP) AND GROUNDSILL AT MOONWALK CREEK-DON BOSCO CREEK JUNCTION, DISTRICT 2,PARAÑAQUE CITY, METRO MANILA","Flood Control and Drainage","On-Going",91691855.32,0,96.03,"Metro Manila 2nd DEO","National Capital Region","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2023-02-14",null,2023,"Regular Infra - GAA 2023 OO-2",14.49289,121.01888,"1381000000","1307600000"]
SHA-256
8acc6c788c74c868490cae2baa70874147b86c1b47f66cbece44c3b2a3d458c5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.