Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23OI0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23OI0052","REHABILITATION OF MULTI - PURPOSE BUILDING, ZAPOTE, LAS PINAS CITY","Buildings and Facilities","Completed",4896491.12,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","MS2 BUILDER AND SUPPLIES INC. (48429)","2023-04-14","2023-09-10",2023,"Regular Infra - GAA 2023 CSSP",14.46636,120.97266,"1380200000","1307600000"]
SHA-256
08c9fd86ca8c00dcc750cceb5fac715a2ba95cfe74a2dcece374afa5c0d579b6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.