Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23Z00019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23Z00019","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER (FLOOD CONTROL WORKS) PHASE II, BRGY. STA. ANA, SAN MATEO, RIZAL","Flood Control and Drainage","On-Going",144655761.27,0,100,"Flood Control Management Cluster","Central Office","11-16 CONSTRUCTION (29646)","2024-01-19",null,2023,"Regular Infra - GAA 2023 OO-2",14.69764,121.11642,"1381300000","1307400000"]
SHA-256
14b78a635cc8f2a78f8489b6ec28d4563b578702ae9e451dede625580f420b5e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.