Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24AI0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24AI0126","CONSTRUCTION OF MULTI-PURPOSE BUILDING, UMINGAN, PANGASINAN","GAA 2024 SSP","Completed",4945061.52,0,100,"Pangasinan 3rd DEO","Region I","R.F. FLORES CONSTRUCTION (FORMERLY PATRIOT CONSTRU (14196)","2024-04-05","2024-10-15",2024,"Regular Infra - GAA 2024 SSP",15.92406,120.81165,"105544000","105500000"]
SHA-256
cc60e5d6c61d14b62f595b520215a4160d13cc9ea12b5d2e4b064b0b0a293ba0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.