Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24BF0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24BF0033","ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE  SYSTEMS- CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, BARANGAY","Flood Control and Drainage","Completed",96490180.17,0,100,"Isabela 2nd DEO","Region II","A COLOMA CONSTRUCTION (46296) / JWU CONSTRUCTION AND SUPPLY (48659)","2024-03-18","2024-10-02",2024,"Regular Infra - GAA 2024 OO-2",17.1536,121.68335,"203123000","203100000"]
SHA-256
ef9a06c2057821abd73c57403d7286484cfa5beb6de50e61b588bbd65ec44039

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.